News & insights

Featured

Why Now is the Best Time to Join the Data Centre Industry

Our Head of Talent, Oli, and Early Careers Specialist, Tianna, explain how to get into the data centre industry, what makes a great hire, and why data centre power is one of the most stable career paths in tech right now.

Generating Conversation guests, episode 9
  • Showing:
  • All
  • Podcasts
  • Case studies
  • AVK thinking
  • Press releases
  • Research
  • Filter by:
  • AVK thinking

    PowerPods – Why the Future of AI Power is Modular

    The industrialisation of AI has begun - this in turn is accelerating world-wide data centre infrastructure roll out. Together the combination of these forces is shifting every data centre development dynamic. This is particularly true for power provision.

    Read more 7 mins read
    AVK Haydock
    AVK thinking

    The Next Generation Powering Tomorrow’s Data

    At AVK, we love welcoming students to carry out their work experience requirements with us. Fresh talent is necessary for our industry, and we're making the first steps towards that - introducing young people to the world of data centres, and presenting the industry as a career option.

    Read more 5 min read
    AVK thinking

    AVK Awarded EcoVadis Bronze Medal

    We're proud to say that AVK has been awarded a Bronze EcoVadis medal. This demonstrates our further commitment to sustainable practices and positive social impact.

    Read more 2 min read
    AVK thinking

    CCHP: The Technology Allowing for Enhanced Energy Efficiency

    CCGT (Combined Cycle Gas Turbines) have widely been accepted as the BAT (Best Available Technique) for large-scale embedded generation. With the recently released emissions drivers from the Environment Agency, there is increasing need for new, emerging technologies for a higher efficiency rating. That solution could be Combined Cooling, Heat and Power (CCHP).

    Read more 4 min read
    AVK thinking

    How to Address the Power Component Crunch in Europe

    Europe stands out as the global data centre market with the longest lead times for large power components. This can delay commissioning and is one of the factors slowing AI infrastructure competitiveness here. What can power solution providers and their data centre customers do to improve things?

    Read more 6 min read
    Power components
    AVK thinking

    Decarbonising Behind-the-Meter Power: How it Works

    In the face of AI-driven growth and grid capacity restrictions, one of the greatest challenges the data centre industry faces is how to decarbonise dispatchable on-site power. At AVK, we're making moves to tackle this challenge.

    Read more 7 min read

    The Power of Insight

    Sign up to our monthly newsletter which covers data centre power news through a detailed lens and accompanying expert commentary.

    Let’s talk!

    Call us today: +44 (0)300 3730912