News & insights

Case studies
Modernising a London Data Centre: Converting DRUPS to Standby Power
A pivotal project: A major DRUPS-to-standby conversion programme in the UK’s data centre industry, driving new standards in advancements and live-site execution.

Case studies
Keeping Critical Infrastructure Live at a Hyperscale Data Centre Campus
A hyperscale data centre operator needed to maintain resilience, ensure asset integrity, and carry out high voltage testing without disrupting a live operational site. AVK delivered a turnkey testing solution using its own equipment, people, and logistical expertise. The result: zero disruption, maximum control, and the beginning of a new service model for future clients.

Case studies
Control at Every Level: An Integrated Power Control System for a London Landmark
AVK’s Control Services team was tasked with unifying the power control infrastructure for a large commercial skyscraper in London. What started as a generator and HV controls project evolved into a full-site integration, demonstrating how our systems bring intelligence, resilience, and flexibility beyond the data centre.

Case studies
Reliability today, scalability tomorrow
Installing sustainably-powered generators for a major data centre project.

The Power of Insight
Sign up to our monthly newsletter which covers data centre power news through a detailed lens and accompanying expert commentary.

Let’s talk!
Call us today: +44 (0)300 3730912

