Powering the future

Category
AVK thinking
Date
1 March 2023
Author
Lawrence Grace, AVK

Introducing innovative solutions for meeting the energy demands of data centres across Europe.

The future of a resilient data center power supply across Europe is a complex issue that requires a collaborative approach from multiple stakeholders. The power requirements of these facilities are significant, and with the rapid growth in the number of data centers predicted, the pressure on the electrical grid is expected to increase exponentially over the next decade.

“On-site generation not only reduces the reliance on the grid but also provides data centers with a reliable source of power.”
Lawrence Grace, AVK SEG

This growth, coupled with the constraints of the ageing electrical grid across much of Europe highlights the need for innovative solutions to meet the energy needs of data centers to begin being deployed today in readiness for the future.

One of the key solutions to meet the increasing power needs of data centers is to improve the energy efficiency of the facilities themselves. This can be achieved by using more efficient servers, cooling systems, and other OME equipment.

Additionally, data centers can also reduce their power consumption by using virtualization and cloud computing technologies, which allow multiple servers to share the same physical resources. This not only reduces the amount of energy required to run the data center, but it also reduces the amount of physical space required which can offer a significant cost saving.

Another solution to meet demand would be to expand the transmission infrastructure to connect new renewable energy sources to the grid itself. This would allow data centers to tap into the increasing supply of renewable energy and also reduce their reliance on fossil fuels. This would also help to reduce the carbon footprint of the data centers, which is an important consideration given the strict sustainability targets many operators work under. However, this is a slow process and requires huge infrastructure investment at a national if not pan-European level and is naturally a long-term transitional process.

In the interim, on-site generation is a viable solution to meet the power demands of data centers. On-site generation not only reduces the reliance on the grid but also provides data centers with a reliable source of power, which is obviously important in the event of power outages.

“Meeting the energy needs of data centers in the future will require a combination of innovative solutions, including improved energy efficiency, expanded transmission infrastructure, on-site generation, and dual-fuel power plants”.
Lawrence Grace, AVK SEG

Self-generation power plants for data centers are becoming an increasingly popular solution as these power plants are designed to generate electricity on-site, rather than relying on the electrical grid – ideal for regions with restrictions or unreliable supply.

On-site generation can even go one step further, and actively supply any excess power generated back into the grid in support of the local network rather than posing as an additional burden.

Finally, dual-fuel power plants are another innovative solution for data centers in areas with constrained or no grid supply.

Building on the idea of self-generation, these power plants can run on a variety of fuels, including natural gas, propane, hydrogen and even biofuels, making them highly adaptable to different environments. They can also replace conventional diesel backup generators, saving space, capital expenditure and reducing potential carbon emissions and footprint of a data center.

An additional benefit of dual-fuel power plants is their ability to provide energy-efficient cooling for data centers through tri-generation; a process in which the waste heat produced by the combustion of fuel in the power plant is used to generate electricity, heat, and cooling.

This results in a combined energy efficiency of more than 80 percent, making dual-fuel power plants a highly efficient option for cooling in a typical data center.

The cooling systems are required to keep the servers and other equipment at optimal temperatures to prevent overheating and ensure smooth operations, but often consume a significant amount of energy and can account for up to 40 percent of the total energy consumption.

With tri-generation, the waste heat produced by the combustion of fuel in the power plant is used to drive a heat recovery chiller, which in turn generates chilled water used to cool the data center.

The waste heat can also be used to provide hot water for heating the data center, and it can even be used for space heating in the surrounding buildings. This results in a highly efficient use of energy and reduces the need for separate cooling, heating, and power systems and increasing overall energy efficiency.

The tri-generation process in dual-fuel power plants not only increases overall energy efficiency, but also reduces the carbon emissions and environmental footprint of data centers as tri-generation is incredibly efficient compared to powering and cooling separately. In addition, the on-site generation of electricity, heat, and cooling reduces the transmission losses and the carbon emissions associated with the long-distance transmission of energy to the site.

Meeting the energy needs of data centers in the future will require a combination of innovative solutions, including improved energy efficiency, expanded transmission infrastructure, on-site generation, and dual-fuel power plants.
By working with trusted industry experts and implementing these solutions now, data centers can ensure a reliable and sustainable power supply for now and the future.

This article first appeared in DatCentreDynamics on March 01, 2023. See the article here.

Stay updated

Get the latest on AVK's future initiatives, news, and updates. Enter your email below.

AVK thinking

CCHP: The Technology Allowing for Enhanced Energy Efficiency

CCGT (Combined Cycle Gas Turbines) have widely been accepted as the BAT (Best Available Technique) for large-scale embedded generation. With the recently released emissions drivers from the Environment Agency, there is increasing need for new, emerging technologies for a higher efficiency rating. That solution could be Combined Cooling, Heat and Power (CCHP).

Read more 4 min read
AVK thinking

How to Address the Power Component Crunch in Europe

Europe stands out as the global data centre market with the longest lead times for large power components. This can delay commissioning and is one of the factors slowing AI infrastructure competitiveness here. What can power solution providers and their data centre customers do to improve things?

Read more 6 min read
Power components
News

AVK Named Among the UK’s Best Managed Companies 2026

AVK have been recognised by Deloitte Private as one of the UK’s top-performing private businesses! Independent judges assessed winners on strategy, culture and commitment, capabilities and innovation, and governance and financial performance. We are honoured to be part of the winning cohort of 2026. This award follows a sustained period of rapid growth at AVK, as demand for data centre power infrastructure accelerates across the UK and Europe.

Read more 3 min read

Let’s talk!

Call us today: +44 (0)300 3730912