    Europe’s First Microgrid: Pure DC in Dublin, Ireland

    Europe's first microgrid in the data centre space has launched at Pure DC's site in Dublin. Operating off-grid and capable of remaining so, the facility on its completion will have an installed capacity of 110MW - 30MW generated from each permanent energy centre, and 20MW from a battery energy storage system (BESS).

    Read more 11 min read
    Europe's first microgrid facility for data centres
    Case studies

    Scaling Up: Modular Power Solutions for a Hyperscaler in the Netherlands

    Data centre projects require meticulous planning and attention to detail. Hyperscale data centre projects require this to extremes. These attentive qualities were demonstrated by our AVK projects and business services divisions. AVK were contracted to work on a hyperscale data centre project in the Netherlands, that faced unique logistical and technical challenges. AVK were called upon to design and deliver modular generator solutions that could overcome transport restrictions, meet tight delivery schedules, and ensure seamless commissioning. With contributions from all divisions in business services, the result was a containerised system built on collaboration, expertise, and transparency. This truly sets a benchmark for future European projects.

    Read more 6 min read
    Crane technology at AVK
    Case studies

    Facilitating Pharmaceutical R&D With Unwavering Controls

    A leading pharmaceutical manufacturer embarked on R&D to carry out vital testing of products before they went to market. To do this, they needed a robust HVAC control system. AVK delivered to deadline, subsequently leading to a continued and fulfilling working relationship with the client.

    Read more 3 min read
    Controls panel for hero image
    Case studies

    Modernising a London Data Centre: Converting DRUPS to Standby Power

    A pivotal project: A major DRUPS-to-standby conversion programme in the UK’s data centre industry, driving new standards in advancements and live-site execution.

    Read more 3 min read
    View from a London data centre
    Case studies

    Keeping Critical Infrastructure Live at a Hyperscale Data Centre Campus

    A hyperscale data centre operator needed to maintain resilience, ensure asset integrity, and carry out high voltage testing without disrupting a live operational site. AVK delivered a turnkey testing solution using its own equipment, people, and logistical expertise. The result: zero disruption, maximum control, and the beginning of a new service model for future clients.

    Read more 3 min read
    AVK equipment at a hyperscale data centre
    Case studies

    Control at Every Level: An Integrated Power Control System for a London Landmark

    AVK’s Control Services team was tasked with unifying the power control infrastructure for a large commercial skyscraper in London. What started as a generator and HV controls project evolved into a full-site integration, demonstrating how our systems bring intelligence, resilience, and flexibility beyond the data centre.

    Read more 5 min read