News & insights
Featured
Climate and Energy Leader Claire Perry O’Neill Appointed Chair of AVK as Partners Group Investment Completes

AVK thinking
Benefits of Microgrid Solutions to Data Centre Stakeholders
Investors. Developers. Operators. Communities.

Case studies
Europe’s First Microgrid: Pure DC in Dublin, Ireland
Europe's first microgrid in the data centre space has launched at Pure DC's site in Dublin. Operating off-grid and capable of remaining so, the facility on its completion will have an installed capacity of 110MW - 30MW generated from each permanent energy centre, and 20MW from a battery energy storage system (BESS).

Tech Article
Three Steps to Prime Power Design
As grid power becomes scarcer there has never been a better time to overhaul and improve the data centre industry's approach to energy systems design.

Tech Article
On-Site Microgrid Power: Primary Consideration for DC Developers
2026 is the year of dispatchable, grid free, on-site power for data centres, for inference AI and for energy security. On-site microgrid power is becoming the primary consideration for base load and grid interaction, for European data centre developers.

Tech Article
Ireland: A Blueprint for the Future?
What the latest developments in one of the world's most power-constrained markets can teach us about the future of European data centre power.

AVK thinking
2025 in Review, Looking Ahead to 2026
Based on insights and data presented during AVK’s annual Press & Analyst event, “The Shape of Energy to Come,” London, December 2025. A year shaped by pause, pressure, and perspective.

The Power of Insight
Sign up to our monthly newsletter which covers data centre power news through a detailed lens and accompanying expert commentary.

Get to power faster
Let’s talk about your site, your timelines and what’s standing between where you are now and where you need to be.
Call us today: +44 (0)300 3730912

